论坛风格切换
 
  • 帖子
  • 日志
  • 用户
  • 版块
  • 群组
帖子
购买邀请后未收到邀请联系sdbeta@qq.com
  • 41阅读
  • 1回复

[行业软件]Deep Excavation PileDVR 2019 v19.0.1.1 [复制链接]

上一主题 下一主题
离线pony8000
 

发帖
53570
今日发帖
最后登录
2025-11-30
只看楼主 倒序阅读 使用道具 楼主  发表于: 2025-11-30 17:50:27

When piles are drilled in, their installation usually deviates from what the design originally calls. For this reason engineers specify verticality and deviation tolerances that must be met during pile installation to ensure that the construction meets the design requirements.


For drilled piles, specialty monitoring equipment can be attached to the drilling head that records the vertical position of the drill head with depth. Up to now the only way to visualize pile deviations has been to use two dimensional cross sections with depth, we were unable as engineers to see and inspect the pile records as if we were really underground, but that is not any more the case!


With PileDVR we are launching a new era in geotechnical inspection. We can now inspect pile installation records in three dimensions or using virtual reality. We can now achieve what is physically impossible, we can now visualize underground installation as if we are standing in real scale within the ground.
桩钻入时,其安装通常与设计最初的名称有所不同。因此,工程师会规定桩基安装时必须满足的垂直度和偏差公差,以确保施工符合设计要求。


对于钻孔桩,可以安装专用监测设备,记录钻头的垂直位置与深度。迄今为止,唯一可视化桩偏差的方法是使用带有深度的二维截面,我们作为工程师无法像在地下一样观察和检查桩记录,但现在情况已不同!



通过PileDVR,我们开启了岩土检测的新纪元。我们现在可以在三维或虚拟现实中检查桩基安装记录。我们现在可以实现物理上不可能的目标,现在可以将地下安装可视化为仿佛我们站在真实的地面中。



通过网盘分享的文件:PileDVR
本部分内容设定了隐藏,需要回复后才能看到


[ 此帖被pony8000在2025-11-30 17:50重新编辑 ]
软件下载咨询邮箱: sdbeta@qq.com (回复及时)
 
精品软件:百度搜闪电软件园  最新软件百度搜:闪电下载吧
有问题联系 sdbeta@qq.com
离线mypwjclu

发帖
4363
今日发帖
最后登录
2025-11-30
只看该作者 沙发  发表于: 2025-11-30 18:18:14
                    [s:120]  [s:120]