- 发帖
- 53653
- 今日发帖
- 最后登录
- 2026-04-09
|
InfoWorks ICM 2027 advanced integrated catchment modeling software. Model complex hydraulic and hydrologic network elements quickly, accurately, and collaboratively. InfoWorks ICM helps you plan for capacity improvements, system expansions, and emergency scenarios.Autodesk InfoWorks ICM Ultimate 2027是一款高端的集成流域建模软件,旨在快速、精确地模拟复杂的城市水力及水文网络。该版本通过高级协同环境、强化的2D数值模拟和更快的计算速度,帮助专业人员应对供水、排水、洪水风险管理及基础设施规划,适用于各类复杂公用事业建模。  核心功能与特性:- 高级综合建模: 能够精确地对河流、洪水、下水道网络、工业管道和地表径流进行一维(1D)和二维(2D)集成建模,适用于污水、雨水及合流制系统。
- 高效协同工作: 支持多个用户同时在一个项目上协作,大大提升大型复杂项目的工作效率。
- 快速精确仿真: 2027版本持续优化计算引擎,提供快速数值仿真,能快速反应复杂的瞬态流动行为。
- 规划与应急响应: 助力用户规划系统容量扩展、预测洪涝风险、进行应急方案分析(如管道堵塞、水泵故障)。
- 全面数据集成: 支持导入包括GIS在内的多种数据源,快速构建和验证水利模型。
Deliver Quality from a Single Platform -ICM was purpose built to provide comprehensive solutions to real world water problems, all in a single software environment. -Every facet of a project can be created or imported into ICM, with world leading simulation solvers in one place. Both ICM and SWMM-based hydraulic assessments allow for rich simulation of rivers, sewer systems, runoff calculations and overland flooding.Save Time without Sacrificing the Project -ICM offers an array of solutions to the myriad of problems which slow down and otherwise mar a successful project delivery. -Increase collaboration and minimize project downtime from otherwise lengthy simulations. -Shift the focus away from model building and data entry, and allocate time to the interpretation of results in order to make the clear and decisive engineering decisions.Plan for the Future -ICM offers users the unique ability to delve into complex infrastructure challenges and return with comprehensive understanding, and solutions. -Explain the why of what is happening, provide defendable mitigation plans and deliver confidence that the com-munity will thrive – whatever gets thrown at it.Enable the Full Team Potential -ICM offers a Workgroup Database environment which enables concurrent database and project access for unlimited users, as well as version control, validation options and conflict resolution options. -Directly control and mitigate risks, and deliver quality projects on time. Save costs related to delayed project deliverables, modelling errors, and missized infrastructure. System Requirements OS:Windows 8.1, 10, 64 bit/64-bit Windows Server 2012 or later CPU:Intel Core i3, i5, i7, or Xeon Processors; SSE2 (or greater).2.2 GHz minimum or higher; hyper-threading (HHT) or multi-core recommended. RAM:4 GB minimum, at least 8GB recommended. (1D Model Build)/8 GB minimum, at least 16GB recommended (1D Local Simulations)/16GB minimum or higher (2D Local Simulations) Display:1440 x 900 recommended or higher at Normal size (96dpi). GPU:For 2D Simulations:NVIDIA GeForce, Quadro, GRID, and TESLA GPU cards (Always use the very latest NVIDIA drivers) Space:1D models 100GB disk space本部分内容设定了隐藏,需要回复后才能看到 [ 此帖被pony8000在2026-04-09 11:59重新编辑 ]
|